|
The case studies are taken from the IPMVP Vol I, 2009 Appendix A, which present a variety of project types and discusses the key M&V design issues arising from the described situations. Each example shows just one IPMVP adherent M&V design, though there are numerous possible designs for any project.
These examples go into varying levels of depth, in order to highlight different features of common M&V approaches. None of them is comprehensive. Readers are referred to the EVO subscribers’ website for more complete M&V Plans and sample savings reports (www.evo-world.org). Also IPMVP Volume III contains example M&V applications for new buildings and renewable-energy projects. EVO subscribers are encouraged to submit their own examples for possible inclusion in the website’s library (email to:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
).
The examples cover 12 different scenarios:
|
|
Pump/motor efficiency improvement (A-2) |
|
Download : Pdf 22 Kb |
|
|
Pump/motor demand shifting (A-2-1) |
|
Download : Pdf 24 Kb |
|
Lighting efficiency (A-3) |
|
Download : Pdf 46 Kb |
|
Lighting operational control (A-3-1) |
|
Download : Pdf 29 Kb |
|
Street lighting efficiency and dimming (A-3-2) |
|
Download : Pdf 39 Kb |
|
Compressed air leakage management (A-4) |
|
Download : Pdf 30 Kb |
|
Turbine-generator set improvement (A-5) |
|
Download : Pdf 41 Kb |
|
Boiler efficiency improvement (A-6) |
|
Download : Pdf 32 Kb |
|
Multiple ECM with metered baseline data (A-7) |
|
Download : Pdf 44 Kb |
|
Whole facility energy accounting relative to budget (A-7-1) |
|
Download : Pdf 35 Kb |
|
Multiple ECMs in a building without energy meters in the baseline period (A-8) |
|
Download : Pdf 45 Kb |
|
New building designed better than code (A-9) |
|
Download : Pdf 30 Kb |
|
|
|
|
|